Skip to main content

Run email and LinkedIn steps at the same time with parallel tracks

Add a Parallel tracks block so slow channels like LinkedIn or call tasks no longer hold back the rest of your sequence.

Beta: Parallel tracks are in beta. They are being turned on team by team, so they may not be available on your team yet.

When a campaign mixes email and LinkedIn steps, leads move at the pace of the slowest channel. Email has more sending capacity than LinkedIn, and LinkedIn steps go through a single LinkedIn account, so a lead can wait days or weeks before the next touchpoint. Call tasks done late block the following steps in the same way.

With a Parallel tracks block, you split your sequence into two tracks that run at the same time, for example one track for email and one for LinkedIn. The LinkedIn track moves at its own pace and no longer holds back your emails.


Limitations

  • Parallel tracks are available on the Multichannel and Enterprise plans.

  • A Parallel tracks block has two tracks: Track 1 and Track 2.

  • You can add several Parallel tracks blocks in the same campaign.

  • You cannot add a Parallel tracks block inside a track.

  • A lead continues after Join only once both tracks are done.


Add parallel tracks to your sequence

Phase 1: Add a Parallel tracks block

  1. In your campaign, open Sequence and click Add step where you want the tracks to start.

  2. Open the Conditions tab and select Parallel tracks, described as "Run steps on separate tracks, at the same time".

    Add step menu in the campaign sequence with the Conditions tab open and Parallel tracks highlighted

Phase 2: Add steps to each track

Each track runs independently, at the same time. A track can contain conditions.

  1. Under Track 1, click Add step and add the steps for one channel, for example your emails.

  2. Under Track 2, click Add step and add the steps for the other channel, for example a LinkedIn invitation and a LinkedIn message, or your call tasks.

Phase 3: Continue the sequence after Join

Join is where the two tracks meet again. The lead continues once all tracks are done.

  1. Below Join, add the steps every lead should get after both tracks.

    ✅ Verify: the block shows Parallel tracks with "Each track runs on its own clock", then Track 1 and Track 2, then Join when all tracks are done.

    Parallel tracks block in a campaign sequence with an Email step in Track 1, a LinkedIn invitation in Track 2, and Join when all tracks are done

Practical example

Your campaign has three emails, a LinkedIn invitation and a LinkedIn message. Add a Parallel tracks block at the start of the sequence. Put the three emails in Track 1, and the LinkedIn invitation and message in Track 2. The emails go out on schedule, while the LinkedIn steps wait for LinkedIn capacity. Below Join, add the steps you want every lead to get once both tracks are done.


Troubleshooting & pitfalls

  • Issue: Parallel tracks is not in the Conditions tab
    ​Root cause: Parallel tracks are in beta and are being turned on team by team. They are also only available on the Multichannel and Enterprise plans.
    ​Fix: Check that your team is on the Multichannel or Enterprise plan. If it is, parallel tracks are not turned on for your team yet.

  • Issue: You cannot add Parallel tracks inside a track
    ​Root cause: A Parallel tracks block cannot be added inside another Parallel tracks block.
    ​Fix: Add a second Parallel tracks block below Join instead.

  • Issue: A lead does not move past Join
    ​Root cause: One of the two tracks is not done for this lead yet, for example a LinkedIn step still waiting for capacity or a call task not done.
    ​Fix: Check the lead's progress in both tracks and complete any pending task. The lead continues once both tracks are done.


If your case is different

Did this answer your question?