Skip to main content

End a lead's sequence at a specific step

Add an End sequence step to stop all remaining steps for leads who reach it, and choose whether they end as Completed, Interested or Not interested.

Some leads should stop getting outreach as soon as they go down a certain path in your sequence. For example, after a call where the lead says they are not interested, you don't want the next emails or LinkedIn steps to go out.

The End sequence step stops the sequence for every lead who reaches it. Nothing after this step runs for them. You also choose the status they end with: Completed, Interested or Not interested.


Limitations

  • You cannot use End sequence as the first step of a campaign. This includes the first step of sequence B in an A/B test.

  • You cannot add a step after End sequence in the same branch.

  • End sequence is available on the same plans as conditions. See How to use conditions in your campaign sequence.


Add an End sequence step

Phase 1: Add the step

  1. In your campaign, open Sequence.

  2. Click Add step where the sequence should end. This is usually inside a condition branch, for example the branch for leads who are not interested.

  3. In the Steps tab, under Other steps, select End sequence.

    Add step menu in a campaign sequence with the Steps tab open and End sequence highlighted under Other steps

The step runs as soon as a lead reaches it. There is no waiting time before it.

Phase 2: Choose the lead status

  1. Click the End sequence step to open its panel. The panel says: "Leads who reach this step leave the sequence: nothing after this step runs for them."

  2. Under Lead status, choose the status leads get when they reach the step:

    • Completed (default)

    • Interested

    • Not interested

    Whatever you choose, the lead's sequence ends. The option only changes the status the lead shows.

    ✅ Verify: the step shows as End sequence in your sequence, with no Add step button below it.

    End sequence step selected in a campaign sequence, with its panel open and the Lead status dropdown showing Completed, Interested and Not interested


Add End sequence to an active campaign

You can add an End sequence step to a campaign that is already running. Leads who are already past that point in the sequence are not affected.


Practical example

Your sequence starts with an email, then a call. After the call, add a Call status condition. In the branch for leads whose call status shows they are not interested, add End sequence and set Lead status to Not interested. These leads get no more steps and show as Not interested. Leads in the other branch continue with the rest of the sequence.


Troubleshooting & pitfalls

  • Issue: End sequence is greyed out in the Add step menu
    ​Root cause: You are adding it as the first step of the campaign. The menu shows This step can't be used at the start of a campaign.
    ​Fix: Add at least one step before it, then add End sequence after that step.

  • Issue: You cannot add a step below End sequence
    ​Root cause: Nothing can follow End sequence in the same branch.
    ​Fix: If some leads should continue, put End sequence only in the branch of the leads who should stop, and add the next steps in the other branch.


If your case is different

Did this answer your question?