Some leads should stop getting outreach as soon as they go down a certain path in your sequence. For example, after a call where the lead says they are not interested, you don't want the next emails or LinkedIn steps to go out.
The End sequence step stops the sequence for every lead who reaches it. Nothing after this step runs for them. You also choose the status they end with: Completed, Interested or Not interested.
Limitations
You cannot use End sequence as the first step of a campaign. This includes the first step of sequence B in an A/B test.
You cannot add a step after End sequence in the same branch.
End sequence is available on the same plans as conditions. See How to use conditions in your campaign sequence.
Add an End sequence step
Phase 1: Add the step
In your campaign, open Sequence.
Click Add step where the sequence should end. This is usually inside a condition branch, for example the branch for leads who are not interested.
In the Steps tab, under Other steps, select End sequence.
The step runs as soon as a lead reaches it. There is no waiting time before it.
Phase 2: Choose the lead status
Click the End sequence step to open its panel. The panel says: "Leads who reach this step leave the sequence: nothing after this step runs for them."
Under Lead status, choose the status leads get when they reach the step:
Completed (default)
Interested
Not interested
Whatever you choose, the lead's sequence ends. The option only changes the status the lead shows.
✅ Verify: the step shows as End sequence in your sequence, with no Add step button below it.
Add End sequence to an active campaign
You can add an End sequence step to a campaign that is already running. Leads who are already past that point in the sequence are not affected.
Practical example
Your sequence starts with an email, then a call. After the call, add a Call status condition. In the branch for leads whose call status shows they are not interested, add End sequence and set Lead status to Not interested. These leads get no more steps and show as Not interested. Leads in the other branch continue with the rest of the sequence.
Troubleshooting & pitfalls
Issue: End sequence is greyed out in the Add step menu
Root cause: You are adding it as the first step of the campaign. The menu showsThis step can't be used at the start of a campaign.
Fix: Add at least one step before it, then add End sequence after that step.
Issue: You cannot add a step below End sequence
Root cause: Nothing can follow End sequence in the same branch.
Fix: If some leads should continue, put End sequence only in the branch of the leads who should stop, and add the next steps in the other branch.
If your case is different
If you want to stop the campaign for one lead by hand, see How to pause and resume a lead in a campaign.
If you want to take a lead out of a campaign completely, see Remove a lead from a campaign.
If you want outreach to stop when a lead replies or clicks, see Stop emailing leads who replied or clicked.
If you want to know what each lead status means, see Understand lead statuses.